© 2023 90.7 WMFE. All Rights Reserved.
Public Media News for Central Florida
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

NASA's Space Launch System Beset By Delays

Artist's impression of the SLS launching from Kennedy Space Center. Image: NASA
Artist's impression of the SLS launching from Kennedy Space Center. Image: NASA

NASA’s next-generation rocket, the SLS, is over-budget and behind schedule. The rocket, which is taller than the Statue of liberty, was scheduled to launch the agency’s Orion capsule on a test-mission around the moon back in 2017 but has since been delayed multiple times.

The most recent launch target is 2020 ], but that is likely to slip, too.

Speaking to a Senate committee last week, NASA’s Administrator Jim Bridenstine floated a new idea for the Orion mission:  launch it on a commercial rocket.

So is the future of NASA’s biggest rocket in the hands of the private space industry? What does that mean for the program here on the space coast?

To talk more about the rocket program Intersection is joined by 90.7’s space reporter Brendan Byrne and Laura Forczyk, a space policy analyst and the founder of Astrolytical.

90.7 WMFE relies on donors like you. Your support allows us to provide independent, trustworthy journalism and fact-based content. Show your support today by contributing on a monthly basis or making a single online donation.